Allen-Bradley PLC-5 Upgrades and Migrations

Cybertech completes numerous Allen-Bradley PLC installations and PLC-5 system upgrades in a wide variety of industries each year. PLC-related work makes up approximately 60% of the 450+ projects Cybertech performs each year. Upgrading legacy systems or replacing obsolescent/unsupported hardware represents a large portion of this work.

We can consult on specific aspects of control systems, or we can provide complete turnkey solutions supported with our design, procurement, fabrication, installation and commissioning experience.

PLC System Integration Consulting

We can:

  • Evaluate your existing PLC control system
  • Evaluate vendor bids for PLC solutions
  • Procure PLC hardware
  • Provide client representation at factory acceptance testing and final site acceptance testing
  • Make PLC performance recommendations
  • Provide detailed designs for PLC system additions
  • Provide migration plans for PLC system obsolescence
  • Design PLC industrial communication networks
  • Provide full integration from primary PLC devices at the plant floor to information at management levels
  • Provide drafting and CAD services
  • Provide electrical and instrumentation design services

PLC Commissioning

We provide start-up and commissioning services with full documentation including:

  • Electrical/instrument PLC system commissioning
  • Factory and site PLC acceptance tests
  • Operations/maintenance manuals
  • Field PLC installation checks
  • Loop/control logic checks

Relevant Project Experience

Cybertech has extensive PLC-5 upgrade experience. Below are some recent sample projects where we operated as the Main Automation Contractor (MAC) for design, programming and commissioning. Performed for a variety of industries, the projects touched on Ethernet, ControlNet, DH/RIO and DeviceNet network topologies.

IndustryPLC-5 Upgrade PathI/ONotes
PipelinePLC-5 to ControlLogix 5000DI/DO ~300, AI/AO ~5090% of the 1771 I/O remains (via RIO) – remainder is 1756
PipelinePLC-5 to ControlLogix 5000DI/DO ~500, AI/AO ~10090% of the 1771 I/O remains (via RIO) – remainder is 1756
Food and BeveragePLC-5 to ControlLogix 5000DI/DO ~1,900, AI/AO ~42515% of 1771 I/O remains (via RIO) – remainder is 1756
PipelinePLC-5 to ControlLogix 5000DI/DO ~500, AI/AO ~10090% of the 1771 I/O remains (via RIO) – remainder is 1756
Food and BeveragePLC-5 to ControlLogix 5000DI/DO ~850, AI/AO ~10025% of 1771 I/O remains (via RIO) – remainder is 1756
PipelinePLC-5 to ControlLogix 5000DI/DO ~500, AI/AO ~10090% of the 1771 I/O remains (via RIO) – remainder is 1756
Water TreatmentPLC-5 to ControlLogix 5000DI/DO ~350, AI/AO ~50100% of the 1771 I/O remains (via RIO)
PipelinePLC-5 to ControlLogix 5000DI/DO ~500, AI/AO ~10090% of the 1771 I/O remains (via RIO) – remainder is 1756

Designs and implements
new control systems
Replaces or upgrades
obsolete equipment
Works with various
PLC/DCS/SIS platforms
Designs and upgrades
control networks
Configures
HMI/SCADA/RTUs
Consolidates data and
supports production reporting
Designs and fabricates
control panels
Performs
commissioning support
Supports your drafting
and CAD needs

Contact an Expert Now